00 33 (0)2 47 23 86 22

lemoulinfort@wanadoo.fr


lundi 12 novembre 2018

November news

The Autumn is moving slowly into winter as the leaves fall and the temperatures drop.  Only one frosty morning so far, but a lot of rain..!  



The work on the bridge is progressing helped by several bits of heavy duty machinery!  

First they drilled holes along the "parapet"

Then cut along the road edge, chains through the holes and lift out the section.
Put it in a truck and crush it on site! 
Almost all removed..



All gone. 

The next stage is to remove the road surface... pictures next month.